City of Greenville City Council met Sept. 27.
Here is the agenda provided by the council:
1. OPEN PUBLIC MEETING
2. PLEDGE OF ALLEGIANCE
3. DISCUSSION OF:
3.1. Buzzard Bay Renovation and Expansion of Phase 2
See drawing. We are applying for an OSLAD grant for phase 2 so the earliest that can happen is 2023. The other phases will follow as funds are made available.
Phase 1 – ADA fishing dock – budgeted for 2022, eliminate permanent site and slip options – This phase has already begun!
Phase 2 – Removal of site 8, Playground and pavilion on site 8 and moving toward the lake, change gravel to concrete pads on sites 1-7, add 4 concrete pad sites across from existing sites, add handicap site, add sidewalk and handrail to ADA fishing dock, offer camping for a minimum of 3 days, offer boat slips as available for day rental if still open as of Friday (campers have first choice).
Phase 3 – Add approximately 20 gravel RV sites with full hook ups plus 1 camp host site, add dump station, add two cabins, expanded parking lot, add extension landscaping shield from road and one residential lot
Phase 4 – Add beach subject to IDNR and health department, may need to add break wall, add shower house.
4. ADJOURNMENT
https://greenvilleillinois.civicweb.net/document/6685/?printPdf=true